Resume for Bill Bauer
Personal information:
Name: Bill Bauer
DOB: 3-1-58
Address: 4320 Waverly Dr. NE, Albany Or.
Contact: 541-990-7641 (Cell)
Email: billbauer50@yahoo.com
Position applying for: Project Manager / OSP Inspector
Work History
1980-2000: – Various contractors throughout the Pacific NW. - Portland Or. Foreman-CATV aerial build 6
yrs./ Evergreen Utilities –Aerial foreman - GTE maintenance contract 4yrs./ Longnecker Comm. -GCI
Cable -Alaska, Supervised the rebuild of GCI’s plant with aerial fiber throughout the state. 4 yrs /
Bouchards Comm. – Aerial foreman -Telephone maintenance contract in Southern California area. 3 yrs.
3-5-2001 thru 5-1-2003: Stargate Telecom - Aerial foreman to Aerial manager: Constructed project in
Yakima WA. & managed the K-Falls Or. project. These projects totaled over 300 miles of combined aerial
plant. The K-Falls project was the 1st aerial project to pass Charter Communication’s QC program
nationwide. Stargate was given a superior rating for overall project construction. Managed the aerial
division until leaving for Century Tel opportunity.
5-13-2003 thru 9-10-2006: Century Tel OSP Inspector: Inspected Century Tel facilities throughout the
state of Oregon. Duties included over seeing all projects aerial & underground to insure proper RUS
construction, splicing methods & insure no NESC violations where created on the aerial work. Did
routine pole inspections while in the field inspecting routine jobs.
1-10-2007 thru 9-5-2007: Martin Group LLC. – Inspected the FTTH project in Molalla Or. for Molalla
Telephone. Insured proper placement of all backbone fiber, fiber drops, Nido placement & splicing to
client standards.
9-6-2007 thru 11-25-2007: Martin Group LLC. – Inspected fiber project for Golden West Telecom in
Deadwood SD. Project was combined underground & aerial construction. Insured proper construction
practices were met to client standards with no NESC violations created.
8-10-2008 thru 5-22-2009: Telplexus - Inspected aerial FTTH project in Eastern KY. for Foothills
Telephone. Insured proper aerial construction practices were met with no NESC violations created.
5-28-2009 thru 12-1-2013: CHR Solutions (formerly Martin Group LLC) – Worked as Project Manager in
Washington for Noanet stimulus fiber projects located in Longview, Vancouver, Republic, & Port
Townsend. Staked, engineered & managed these projects from start to final closeout. Also staked &
engineered Noanet aerial projects for Pasco, Chehalis, and Centralia & Washougal WA. Inspected for
Sovernet aerial fiber stimulus project in VT. Inspected the aerial plant to ensure proper construction was
completed with no NESC violations created.
Strong points:
· Strong knowledge of OSP construction standards & NESC code violations.
· Strong knowledge of RUS units.
· Strong knowledge of aerial communication make-ready problem solving.
· Excellent communication & PR skills with all entities involved (public & private).
· Strong managerial leadership & communication skill sets.
· Ability to create accurate reports, records & asbuilt drawings as required.
· Self-motivated, dependable & thorough.
· Stays on task to ensure deadlines are met.
· 33 yrs. of combined aerial OSP construction, inspection & management experience.
Personal work references:
John Profitt – 541-921-9704 – Century Link / Comm. Tech.
Lonnie Wylie – 606-793-7273 – Osmose / Senior OSP Engineer
Tyler Olsen – 541-891-8531 - Charter Communication / Regional Manager